Rainaway Spouting, Palmerston North Gutter Installation home page 0800 211 502

New Home Gutters in Palmerston North

Building new or adding on? Your decisions are profile, colour and when gutters go on, and that last one matters most to your builder. Rainaway forms each length on site, in Kelvin Grove, Fitzherbert or wherever you’re building.

An installer in hi-vis on a ladder fitting new spouting to the eave of a new house, with a grassy hill behind
Fitting new spouting to the eave of a new build.

Send Us Your Build Details

  • Site address or subdivision
  • Plans or drawings, if you have them
  • Your builder’s programme
  • Roof colour, if it’s picked
Request a quote for the gutters
Joins
Corners only
Profiles
Three, in Colorsteel
Old gutters
Taken away
No Leaks
10-year guarantee

What to Decide Before Your Roof Goes On

Pick your gutter colour alongside the roof and joinery, so all three sit together. Profile is your other call. Classic 125 is right for a typical new home, and Classic 150 makes sense on a large or two-storey roof with long lengths to each downpipe.

Putting both on your plans early lets us price accurately and tells your builder what to expect at the fascia.

Adding On to an Existing House?

Your extension’s gutters can copy the profile and colour already on the house. Where old ones are plastic or near their end, pricing your whole house at once saves a second visit later.

Either way, we measure old and new together so lengths and corners line up.

Around Your Builder’s Programme

A new build always has another trade on site. Rainaway works in with whoever else is there, painters and plumbers included, and fits gutters once your fascia is ready.

If painters want the fascia finished before gutters go on, we come after them. Tell us what order your builder runs, and that’s what we follow.

★★★★★

…really great job replacing our old guttering with roof- matching steel. Really looking great, done on-time and on-budget, and working well with other other tradies on-site at the same time.

David A.Google review · Gutter replacement

Measured Off the Finished Frame

Plans and a finished frame rarely agree to the centimetre. We measure your fascia once it’s up, then our roll-former makes each length right there, so every gutter fits the walls you actually have.

Downpipes go in to suit your drainage plan, as part of that same visit.

An installer at the roll-former trailer on a lawn beside a house, with rolling green hills behind
The roll-former trailer set up beside the house.

Pricing Gutters for a Build

  • Length of fascia on your plans
  • Hips, valleys and corners in your roof
  • Downpipe count from your drainage plan
  • Profile size
  • Scaffold already up, or needed

Your New Home Gutter Questions

Not covered here? Call 0800 211 502, or add your question to the quote form.

At what stage do new home gutters go on?

Once your roof is on and fascia is fixed, and painted if it needs to be, while scaffold is still around your house. Your builder sets the day.

Can my builder deal with you directly?

Yes. Your builder can line up timing with us, and you still get your written quote.

Does a new build quote include downpipes?

Yes. Downpipes are part of the job, placed to your drainage plan so each one meets its stormwater connection.

Does a new home get the No Leaks guarantee?

Yes. A new home is covered by our 10-year No Leaks guarantee in writing, like every install.

Price Gutters for Your Build

Plans help, but a roof plan or a photo of your frame will do. Add your builder’s timing and Joel will come back with a price.

Useful for your quote

  • Site address or subdivision
  • Plans or drawings, if you have them
  • Your builder’s programme
  • Roof colour, if it’s picked

Easier by phone? Call 0800 211 502.

What do you need?

    Fields are required unless marked optional. Privacy policy